Coconut Grove · Miami

Hampton Inn

Parking deck restoration with a 45-mil traffic-bearing system.
45-mil
Traffic coating
Garage
Deck restoration
YHCE
Engineering plans
About the project
Restoration of the upper garage deck followed YHCE Engineering plans. Every crack was mechanically prepared and repaired before the new waterproofing system went down: overhead cracks with Sikadur® Crack Fix high-strength epoxy and slab cracks with Sikadur®-55 SLV.
The existing coating was removed and the concrete substrate ground and profiled. Sikalastic® primer and 720 One Shot were applied to a 45-mil elastomeric polyurethane thickness, followed by stall striping.
Scope of work
  • Existing coating removal
  • Mechanical grinding and profiling
  • Overhead crack repair, Sikadur Crack Fix
  • Slab crack repair, Sikadur-55 SLV
  • Sikalastic 720 One Shot, 45-mil
  • Stall striping
Hospitality · Completed